Signals — the evidence, and our side
Open this screen in Saral/projects/subcontractors/signals
The first tab of Termination: what Saral sees on each package every night — late completion, progress behind time, nobody on site, defects not put right, safety, late design, instructions ignored, insolvency — each with the records behind it, and beside them what we owed the firm. A QS reads it before anything is proposed.
You enter
- Nothing: every signal is read from the records
Saral fills in
- Each package's performance signals, with the records behind each one
- What we owed the firm: unpaid bills, missed notices, unanswered questions
- A proposed concern when the signals cross the threshold
It produces
- The evidence a case is opened on, under Cases
The evidence, and our side
Late completion, progress behind time, nobody on site, defects not put right, safety, late design, instructions ignored, insolvency — each with the records behind it. Beside them, what we owed the firm: unpaid bills, missed notices, unanswered questions. A case built on one side of the account is a weak case, so both are shown together.
Unknown is never clear
A signal Saral could not read — no head counts recorded, no programme dates, no defects register — is shown as unknown, never as clear. When the signals cross the threshold Saral proposes a concern on Cases; it never opens one for you.