Packages — the register
Open this screen in Saral/projects/subcontractors/packages
One row per work package, let or not: code, title, element, type, who runs it, how far design and construction have got, and the four columns the client's schedule prints. Every other Subcontractors page works over this list, so it is the first thing to set up — the first tab of Appointment.
You enter
- The package register — code, title, trade — or bring it in from the Payment Schedule / a won tender
- A dated update per discipline, never one comment cell overwritten
Saral fills in
- Each package's status (planned → tendering → appointed → on site → complete) from the record
- Design % from the drawings register, construction % from the application's CSA lines, and the Schedule columns
- What the firm still owes for the month, each item missing, received or expired, with where Saral knows it from
It produces
- The Schedule of Sub-Contractors for the client (PDF, Excel, email)
- The “what you owe us” email, sent from your own Outlook
Packages: status comes from the record
You never tick a package forward. Issuing a tender makes it tendering, Appoint makes it appointed, the first head count or application makes it on site, and the PC certificate makes it complete. Design % is read from the drawings issued to the package and construction % from the application's contract sum analysis lines; type a figure only where the register is incomplete, and say why. What each discipline says about a package is a dated history, never one comment cell the next person overwrites. A package here and a package on the Payment Schedule are the same thing seen twice — the import suggests exact matches and a person accepts each link.
Next screen: /projects/subcontractors/procurement